Projects

we simply do automation

Participation in Virtual Power Plant
for Electricity Authority of Cyprus (EAC)

Fully Automated Factory for Soaps and Detergents
Concrete Batching Plants
Water Purification Plant
Sewage Treatment Plants
Animal Waste Treatment Plant
Animal feed Mill Plants
Flour Mill Plant
Participation in Virtual Power Plant for EAC
Crushing Plant

The project

EAC (Elctricity Authority of Cyprus) has decided to utilize existing generating sets already installed in various consumers’ premises for the purpose of gaining additional generating capacity in the form of cold-reserve. The system, hereby called Virtual Power Plant (VPP), is expected to be utilized in the following situations:

(a)    As cold reserve during unexpected generation outages in order to assist in system frequency recovery and/or stability.

(b)   During the hours of peak energy demand in order to address the problem of increased consumption especially during the hot summer months.

(c)    As a uniform Power Generating Plant that will be committed along with the rest of the available generation according to Transmission System Operators unit commitment policy in a pre-programmed schedule.

Project Objectives

The system has the following general objectives: 

Our participation

Our company is now one of the EAC preferred installers.

Our participation in the project is that we have undertaken the implementation of the system that will put in parallel the genets with the EAC grid.

The implementation

The implementation is done using as the heart of the system the T-GC500plus (Multiple Parallel gen-set controller)

Bellow is the schematic diagram of the installation

As we delivered a lot of gensets since now, we have faced some tricky problems, mainly because of the variety of the gensets peripherals we had to control.

 Although we found in front of us, almost all the AVRs and speed controllers that exists in the global market, we manage to solved all those problems effectively and quickly because of two major factors

  •  The reliability and flexibility of the controller
  • The really fast  and documented support of the support department of Huegly Tech (many thanks to Mr. Jiri Mildorf and Mr. Evaggelos Antoniadis)

Success Story

 
odysseassite012025.jpg
Installation on HELENIC BANK Central Offices

Since now we have implemented more than 18 MWatt  (18,000 KW) for the following Customers

  


 HELLENIC BANK OF CYPRUS

o   Standby Genset at Central offices in Nicosia                                                         550KW

o   Standby Genset at Peripheral Offices in Larnaca                                                  550KW

 


 

Water Treatment Department (WTD)

o   Standby Genset at Waste Water Treatment Plant  in VATHIA GONIA                  550KW

o  Standby Genset at Water Desalination Plant in Kannaviou                                  800KW

 

 


ELMENI QUARIES LTD

o   Standby Genset at Crushing Plant in VATHIA GONIA                                          1000KW

 

 


HIPPOCRATEON PRIVATE HOSPITAL

o   Standby Genset at Hospital in Ncosia                                                                   500KW

 

 

 

SEDIGEP LTD

o   Standby Genset at Factory in Astromeritis                                                            800KW

 

 
 


STOA LTD

o   Standby Genset at facilities in Nicosia                                                                 550KW

 

 
 


 PITTAS DAIRIES LTD

o   Standby Genset at factory in Nicosia                                                                    550KW

 


THOC
(Cyprus Theater Organisation)

o   Standby Genset at Main Stage in Nicosia                                                            550KW

 

 


CASOULIDES MASTER PRINTERS LTD

o   Standby Genset at factory in Nicosia                                                                    500KW

 


 

A.MINTIKIS FARM LTD

o   Standby Genset at Slaughterhouse  in Tseri                                                          700KW

 

 

 

FASOURI WATERMANIA – WATERPARK

o   2 Standby Gensets at WaterPark  in Fasouri, working in parallel           2*982= 1964KW

 


 

YGIA  POLYCLINIC

o   Standby Genset at hospital  in Limasol                                                                  679KW

 

 

CHARALAMPIDES CHRISTIS LTD

o 2 Standby Gensets at factory in Limassol working in parallel                 2*532= 1064KW


 

 

 

CYPRUS OLYMPIC COMITEE                      

o Standby Genset at Olympic House in Nicosia                                                          470KW

 

ARETAEIO HOSPITAL

o 2 Standby Gensets at Hospital in Nicosia working in parallel                   2*615= 1230KW


 

 

CYFIELD-NEMESIS GROUP

o Standby Genset at crushing plant in Miser                                                               800KW


 

lakovos Photiades Foodstuff Suppliers, Ltd.

o Standby Genset at Warehouse in Nicosia                                                                400KW


 

 

IKEA

o Standby Genset at IKEA SHOP in Nicosia                                                                 679KW


 

 

KARAISKAKIO FOUNDATION

o Standby Genset at central offices in Nicosia                                                            400KW

 

PYRGA QUARIES LTD

o Standby Genset at Crushing Plant in Pyrga loaded on two transformers               1300KW

 

 

APOLONIO PRIVATE HOSPITAL

o Standby Genset at Hospital in Nicosia                                                                     679KW


 

 

MEDITERANEAN HOSPITAL

o Standby Genset at Hospital in Limassol                                                                   400KW

odysseassite012022.jpg odysseassite012014.jpg
Installation at CASOULIDIS MASTERPRINTERS in Nicosia
Automatic Bag Paletizer 
Compressors Unit  Control
for Zorbas